ANY-maze Help > The ANY-maze reference > The Results page > Viewing results as track plots > Selecting the track plot the report should show

Selecting the track plot the report should show

In brief

You should use the drop-down list labelled Track plot to show to choose the Track plot to show in the report. The list will contain all the Track plots included in the protocol. If the protocol includes no Track plots you'll need to add one before you can create the report.

The Clear report settings button in the ribbon bar can be used to reset all the report settings back to their defaults.

© Copyright 2003-2026 Stoelting Co. All rights reserved

ANY-maze help topic T0857